Section B10Red Sky Culvert

B10/ Red Sky Culvert
  • Upgrading the existing culvert
B10/ Red Sky Culvert
  • Upgrading the existing culvert
B10/ Red Sky Culvert
  • Upgrading the existing culvert

B10/ Red Sky Culvert

The upgrading of this culvert is part of the East Belfast Flood Alleviation Scheme which will reduce the flood risk to residents and businesses in the area.

Construction of the culvert involved diverting the river waters using heavy industrial pumps. This allowed access to the dry river bed where the new culvert was installed.